Kathmandu NPTLogin | Register

Ranikot Fort Bhaktapur: Excavation to Resume After Nine Years

Ranikot Fort Bhaktapur

Ancient stone fort ruins on a hilltop in Nepal
Photo: Harsh & Leena Bansal / Pexels

The Ranikot Fort Bhaktapur excavation is set to resume after nine years, with the Bagmati Province government asking the Department of Archaeology to restart the stalled dig and protect the historic site, Gorkhapatra reports. Kiran Thapamagar, Chief Minister of Bagmati Province, drew the department’s attention to the need to resume the archaeological excavation of Ranikot Fort, which has been stopped for nine years, and to conserve and rebuild it.

The fort stands in wards 7 and 8 of Suryabinayak Municipality in Bhaktapur, and the Chief Minister inspected both the fort and the Dhyampedanda to Ranikot road section. During the inspection he said the province government would help conserve the historic heritage, and he committed that the province would provide the support needed to rebuild the fort. Ranikot Fort is an important heritage site because it is linked to an ancient settlement, to security arrangements and to historic political activity in the valley, and it needs further study, excavation and conservation, he said.

The archaeology of the site is already partly known. The Department of Archaeology carried out a preliminary excavation from Bhadau 10 to 16 in 2074, and in that dig the remains of a Malla era palace, bricks and pottery were found. The work was then stopped with a promise of further excavation, but nine years have passed and the work has still not resumed. That gap is the heart of the story: a site whose importance was confirmed by excavation has been left without follow up, while the structures above ground have continued to decay.

The engineering questions at Ranikot Fort Bhaktapur are the same ones that face every heritage excavation in Nepal. The below ground remains need careful, layer by layer digging so that the palace remains, bricks and pottery are recorded before they are disturbed. The above ground ruins need stabilisation so that walls and terraces do not collapse while the excavation proceeds. And the site needs a conservation plan that decides what to rebuild, what to leave as ruins, and how visitors will move through the fort without damaging it. None of that work can begin until the excavation itself resumes.

The road to the fort is part of the same problem. The short road from Ranikot toward Panauti in Kavrepalanchok has become dilapidated because of the rains, and the Chief Minister said the province would take the initiative to upgrade it and coordinate with the concerned bodies. A fort that cannot be reached cannot be conserved or visited, and the road upgrade is therefore a precondition for the heritage work rather than a separate project.

Local voices back the plan. Ramsundar Barke, who runs the Hotel Highland Resort, told Gorkhapatra that the dilapidated condition of the road has affected the movement of tourists, and that the excavation of Ranikot Fort, its conservation and its development as a tourist destination need the attention of all three tiers of government. Pushparaj Basnet, ward chairperson of Suryabinayak Municipality 8, said the Dhyampedanda to Ranikot road should be upgraded so that the area becomes a major tourist destination, and he said hundreds of vehicles use the road every day while work toward Kavrepalanchok continues.

What happens next is the response from the Department of Archaeology. The Chief Minister has asked the department to resume the excavation and has committed provincial support for the rebuilding, but no date for the restart has been announced. For engineers and heritage professionals, the test will be whether the resumed dig is followed by a conservation plan, a rebuilt road and a management arrangement that keeps the site open to visitors without repeating the nine year stall.

Read more infrastructure news in the News section of Eve Construction, Nepal’s construction hub.

Get construction news in your inbox

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top