The new e-GP system Nepal is now in operation, Infrastructure Development Minister Sunil Lamsal announced on November 3, 2026, which is Kartik 17, 2083 in the Nepali calendar. The announcement marks the return of electronic procurement as the main route for publishing public construction and goods tenders, after a period when the earlier system was out of service. For firms and offices that follow public tenders in Kathmandu and across the country, the change takes effect from today, and the first phase sets out who must register, how bids must be published, and how bids will be opened and evaluated.
The relaunch follows a suspension that began in mid-September 2026, when a high security risk was identified in the earlier system. During the interruption, the procurement portal showed a maintenance page, and the concern included security and tampering risk. That pause mattered because the portal had been the main channel through which public construction tenders were published. Restoring the service therefore restores a central point of access for tender notices, bid submission, and bid records, rather than leaving offices and bidders to rely on scattered or informal channels.
How the new e-GP system Nepal will work in the first phase
In the first phase, the notice asks public bodies, bidders and suppliers to use the new system in a clear sequence. Registration comes first, followed by publication, submission, and then opening and evaluation. The steps below summarise the arrangements announced for this phase, in plain terms.
- Registration: Public bodies, bidders and suppliers are asked to register in the new system.
- Publication: From the date of the notice, all public bodies must publish national and international level bids for construction works and goods procurement only through this system.
- Submission: Bidders and suppliers may submit a bid proposal within the stated deadline either online or as a hard copy at the office, using one of those two channels.
- Opening and evaluation: Public bodies must carry out bid opening and evaluation through the e-GP system, recording any hard-copy submissions in the opening minutes, known as muchulka, and in the evaluation report.
The dual submission route is an important detail for this phase. A bidder that cannot complete an online submission in time still has a defined office route, but must choose one channel and meet the stated deadline. At the same time, the requirement to record hard-copy submissions in the opening minutes and the evaluation report keeps those bids visible inside the electronic record, so the process does not split into separate paper and online tracks.
Why it matters for contractors, suppliers and public bodies
For contractors, the practical effect is that tender discovery and bid preparation now return to one system. Firms should confirm that their registration is complete, check that contact and company details are current, and monitor new notices closely as offices resume publication. Missing a registration step, or watching an old channel, could mean missing a deadline for a construction work that would otherwise have been in scope.
For suppliers, the new e-GP system Nepal also brings goods procurement back into the same electronic process. Suppliers of materials and equipment should review the categories that apply to their products, prepare the documents commonly required for a bid, and allow time for either online submission or delivery of a hard copy to the relevant office. For public bodies, the change is a compliance point as much as a technical one, because national and international level bids for construction works and goods must now be published only through the new system, and opening and evaluation must be carried out through it.
Related developments show why clear procurement records matter. Readers following public contract policy can also read our coverage of the special price adjustment for construction materials in public contracts, and the recent termination of stranded contracts after a ministry meeting on contract progress.
What happens next
As the new e-GP system Nepal moves into regular use, the next steps are registration, publication of new bids through the new system, and careful attention to further notices from the Public Procurement Monitoring Office. Offices are expected to publish new national and international level bids through the system, and bidders should check each notice for its own deadline, submission channel, and evaluation details, since those details can vary by tender.
In Kathmandu time, the announcement was made on Tuesday, November 3, 2026. Firms and offices should therefore treat notices dated from that day as falling under the new arrangements, and should keep copies of registrations, submissions, and receipts until the relevant bid process is complete. If further guidance is issued, it is likely to clarify registration help, publication practice, or evaluation recording, and this site will report material updates as they are confirmed.
Source: Minister Sunil Lamsal’s Facebook post, November 3, 2026



