If you cannot be at the site every day, hire an engineering consultancy to supervise the construction for you. This supervision agreement format defines what your supervising engineer will do, how often they visit, how they report to you, and what it costs. Use it together with the House Construction Agreement.

⬇ Download Supervision Agreement (Word .docx)

CONSTRUCTION SUPERVISION CONSULTANCY AGREEMENT

This Agreement is made on this ______ day of ____________, 20____ (B.S. ____________) at ____________, Nepal.

BETWEEN

Mr./Mrs./Ms. ________________________, son/daughter/wife of ________________________, permanent resident of ________________________, holding Nepali Citizenship Certificate No. ______________, issued from ______________, (hereinafter called the “Owner” or “First Party”),

AND

________________________ [Consultancy name], having its office at ________________________, registered under ________________________ with Registration No. ______________, PAN No. ______________, represented by Mr./Mrs./Ms. ________________________, (hereinafter called the “Consultant” or “Second Party”).

The Owner and the Consultant shall individually be called a “Party” and collectively the “Parties”.

WHEREAS the Owner is constructing a ______-storeyed residential house at ________________________ (District: __________, Municipality/Rural Municipality: __________, Ward No. ____, Kita (Plot) No. ____, Area: ________) under building permit (Naksa Pass) No. __________ dated __________;

AND WHEREAS the Owner has engaged ________________________ as the main contractor for the said construction;

AND WHEREAS the Owner wishes to engage the Consultant for independent construction supervision of the said works;

NOW THEREFORE the Parties agree as follows:

1. SCOPE OF SERVICES. 1.1 The Consultant shall supervise the works at every critical stage, including: site layout, foundation, plinth/DPC, each RCC slab and staircase, roofing, brickwork and plaster, plumbing and electrical first and second fix, finishing works, and final handover. 1.2 Verify workmanship and materials against the approved drawings, BOQ, specifications and the Nepal Building Code (NBC). 1.3 Witness critical quality tests (concrete cube tests, slump tests, steel checks) and review the test reports. 1.4 Check and certify the contractor’s running bills: verify measured quantities, flag overbilling and unapproved extra work before the Owner releases payment. 1.5 Attend the municipal stage inspections (plinth level, superstructure) along with the contractor. 1.6 Prepare the snag list at completion and verify that the contractor rectifies every item. 1.7 The Consultant acts as an independent supervisor and advisor to the Owner. Instructions to the contractor with financial or major technical effect require the Owner’s prior written approval. The Consultant may order immediate stoppage of any work that is structurally unsafe or grossly non-conforming, and shall inform the Owner within 24 hours.

2. VISIT SCHEDULE. 2.1 The Consultant shall make a minimum of ______ site visits per month, plus mandatory visits at every stage listed in Clause 1.1. 2.2 Extra visits requested by the Owner shall be charged at NPR ____________ per visit.

3. REPORTING. 3.1 After every visit, the Consultant shall send a written report with dated photographs and videos within ______ days, by WhatsApp/email to ____________. 3.2 Any structural safety issue, major non-conformity, or work beyond the approved drawings shall be reported to the Owner immediately by phone and in writing.

4. FEE AND PAYMENT (choose one and delete the others). 4A. Lump sum: NPR ____________ (in words: Nepalese Rupees ________________________________ only) for the supervision period defined in Clause 5. 4B. Per visit: NPR ____________ per site visit, payable monthly against the visit reports. 4C. Percentage: ______% of the certified value of the contractor’s work, payable with each certified running bill. 4.2 Payment schedule: ______% on signing, the balance ____________. 4.3 Travel outside ________________________ shall be reimbursed at actual cost against bills.

5. DURATION. This Agreement runs from ____________ to ____________. If construction extends beyond this period, it may be extended by mutual written agreement at NPR ____________ per extra month.

6. CONSULTANT’S TEAM. Supervision shall be led by ________________________ (name), Nepal Engineering Council Registration No. ______________. Replacement with another person needs the Owner’s prior written approval, and the replacement must be equally qualified.

7. INDEPENDENCE. The Consultant shall not accept any payment, commission, gift or favour from the contractor, subcontractors or material suppliers. Any breach of this clause is grounds for immediate termination by the Owner.

8. PROFESSIONAL LIABILITY. The Consultant shall exercise professional skill, care and diligence. The Consultant is not liable for the contractor’s defaults, except where loss results from the Consultant’s failure to inspect or report as required by this Agreement.

9. OWNER’S OBLIGATIONS. Provide site access, share the approved drawings, BOQ and the construction contract; make payments per Clause 4; decide on escalated issues within ______ days of the Consultant’s written referral.

10. TERMINATION. Either Party may terminate with ______ days’ written notice. On termination, the Owner shall pay for all services rendered up to the termination date, supported by visit reports.

11. DISPUTE RESOLUTION. Disputes shall first be settled by mutual negotiation within ______ days, failing which by mediation/arbitration in ____________, or by the competent court of Nepal. (Choose one and delete the other.)

12. GOVERNING LAW. This Agreement is governed by the laws of Nepal, including the National Civil Code, 2074.

13. GENERAL. This Agreement is the entire agreement between the Parties. Amendments are valid only in writing signed by both Parties.

IN WITNESS WHEREOF the Parties have signed on the date first written above, in the presence of the witnesses below. Revenue stamp(s) as required have been affixed.

Owner (First Party): Signature: ____________   Name: ________________________   Date: ____________

Consultant (Second Party): Signature: ____________   Name: ________________________   Consultancy seal: ____________   Date: ____________

Witness 1: Signature: ____________   Name: ________________________   Citizenship No.: ____________   Address: ________________________

Witness 2: Signature: ____________   Name: ________________________   Citizenship No.: ____________   Address: ________________________

Attachments: Citizenship copies of both parties; consultancy registration and PAN copies; lead engineer’s NEC registration copy; Naksa Pass copy; construction contract copy (relevant pages).

Note: This is a general template for guidance. Get it reviewed by a lawyer before signing, especially for high value contracts.