Kathmandu NPTLogin | Register

Clearance of Bhotekoshi and Trishuli River Flood Deposits at Powerhouse Area of Upper Trishuli 3A Hydropower Station, Rasuwa

Upper Trishuli 3A Hydropower Station has invited bids for the clearance of Bhotekoshi and Trishuli river flood deposits at the powerhouse area of Upper Trishuli 3A Hydropower Station at Salletar, Rasuwa, through national competitive bidding.

Contracting authority: Upper Trishuli 3A Hydropower Station

IFB number: NEAUT3AHPS/2083/084-CST-02

Submission deadline: November 30, 2026 at 12:00 PM (Nepal time). Technical bids open the same day at 2:00 PM.

Location: Salletar, Rasuwa

Source: Bolpatra e-GP notice

Get construction news in your inbox

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top