{"id":331,"date":"2026-09-30T03:53:01","date_gmt":"2026-09-30T03:53:01","guid":{"rendered":"https:\/\/eve-construction.com\/?page_id=331"},"modified":"2026-09-30T03:53:03","modified_gmt":"2026-09-30T03:53:03","slug":"engineer","status":"publish","type":"page","link":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/lok-sewa\/engineer\/","title":{"rendered":"Civil Engineer (Gazetted 3rd Class) \u2014 Syllabus &#038; Practice"},"content":{"rendered":"<p>Post: Engineer (\u0907\u0928\u094d\u091c\u093f\u0928\u093f\u092f\u0930), Nepal Engineering Service, Civil Group \u2014 General, Highway, Sanitary, Irrigation and Hydropower sub-groups. Level: \u0930\u093e\u091c\u092a\u0924\u094d\u0930\u093e\u0902\u0915\u093f\u0924 \u0924\u0943\u0924\u0940\u092f \u0936\u094d\u0930\u0947\u0923\u0940 (\u092a\u094d\u0930\u093e\u0935\u093f\u0927\u093f\u0915), Gazetted 3rd Class (Technical). Qualification: Bachelor&#8217;s degree in Civil Engineering (and NEC registration).<\/p>\n<p>This is Nepal&#8217;s main entry point into the civil service for graduate engineers. The competition is written-first: only candidates who pass the written stage reach the interview.<\/p>\n<h2>Exam pattern<\/h2>\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Paper<\/th>\n<th>Format<\/th>\n<th>Marks<\/th>\n<th>Time<\/th>\n<th>Pass marks<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Written<\/td>\n<td>Paper I \u2014 General Subject<\/td>\n<td>Objective (MCQ), 100 \u00d7 1 mark<\/td>\n<td>100<\/td>\n<td>1 hr 15 min*<\/td>\n<td>40<\/td>\n<\/tr>\n<tr>\n<td>Written<\/td>\n<td>Paper II \u2014 Technical Subject<\/td>\n<td>Subjective, 10 \u00d7 10 marks<\/td>\n<td>100<\/td>\n<td>3 hours<\/td>\n<td>40<\/td>\n<\/tr>\n<tr>\n<td>Final<\/td>\n<td>Interview<\/td>\n<td>Individual oral<\/td>\n<td>30<\/td>\n<td>\u2014<\/td>\n<td>\u2014<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><em>* The official syllabus specifies 1 hour 15 minutes; recent PSC exam-centre notices show 1 hour 30 minutes. Confirm against your admit card \/ the current PSC notice.<\/em><\/p>\n<p><strong>Paper I structure:<\/strong> Part I \u2014 General Awareness &amp; General Reasoning Test; Part II \u2014 General Technical Subject (the 9-unit syllabus below).<\/p>\n<p><strong>Negative marking:<\/strong> +1 for a correct answer, \u22120.2 (20%) for a wrong answer in Paper I. No deduction for leaving a question blank.<\/p>\n<p><strong>Paper II format:<\/strong> the paper is divided into 4 sections; you receive 4 separate answer books and must answer each section&#8217;s questions in its own book. A 10-mark item can be one long question, a question in two or more parts, or short notes.<\/p>\n<p><strong>Medium:<\/strong> Nepali or English, or both.<\/p>\n<h2>Paper I, Part II \u2014 General Technical Subject (100 questions)<\/h2>\n<table>\n<thead>\n<tr>\n<th>#<\/th>\n<th>Unit<\/th>\n<th>Questions<\/th>\n<th>Weight<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1<\/td>\n<td>Structural Analysis &amp; Design<\/td>\n<td>20<\/td>\n<td>20%<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td>Construction Materials<\/td>\n<td>15<\/td>\n<td>15%<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td>Concrete Technology<\/td>\n<td>12<\/td>\n<td>12%<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td>Construction Management<\/td>\n<td>12<\/td>\n<td>12%<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td>Estimating &amp; Costing, Valuation &amp; Specification<\/td>\n<td>10<\/td>\n<td>10%<\/td>\n<\/tr>\n<tr>\n<td>6<\/td>\n<td>Drawing Techniques<\/td>\n<td>10<\/td>\n<td>10%<\/td>\n<\/tr>\n<tr>\n<td>7<\/td>\n<td>Engineering Survey<\/td>\n<td>8<\/td>\n<td>8%<\/td>\n<\/tr>\n<tr>\n<td>8<\/td>\n<td>Engineering Economics<\/td>\n<td>8<\/td>\n<td>8%<\/td>\n<\/tr>\n<tr>\n<td>9<\/td>\n<td>Professional Practices<\/td>\n<td>5<\/td>\n<td>5%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>1. Structural Analysis &amp; Design (20 questions \u2014 the single biggest unit)<\/h3>\n<ul>\n<li>Stresses and strains; theory of torsion and flexure; moment of inertia of sections.<\/li>\n<li>Analysis of beams and frames: bending moment, shear force and deflection of determinate structures; energy methods; three-hinged systems; indeterminate structures \u2014 slope deflection and moment distribution; influence line diagrams for simple beams; unit load method.<\/li>\n<li>Reinforced concrete: working-stress vs limit-state philosophy; analysis of RC beams and slabs in bending; shear, deflection, bond and end anchorage; design of axially loaded columns; isolated and combined footings; introduction to prestressed concrete.<\/li>\n<li>Steel and timber: standard and built-up sections; riveted, bolted and welded connections; ties, struts, axially loaded and eccentric columns, column bases; design principles of timber beams and columns.<\/li>\n<\/ul>\n<h3>2. Construction Materials (15)<\/h3>\n<ul>\n<li>Properties of building materials: physical, chemical, constituents, thermal.<\/li>\n<li>Stones \u2014 characteristics and requirements of good building stone; ceramic materials, brick types and testing; cementing materials \u2014 lime and cement types, properties, cement-mortar tests; metals \u2014 steel types and properties, alloys; timber \u2014 timber trees of Nepal, types and properties of wood; asphalt, bitumen and tar; paints and varnishes; polymers; soil properties and parameters.<\/li>\n<\/ul>\n<h3>3. Concrete Technology (12)<\/h3>\n<ul>\n<li>Constituents and properties of concrete; water\u2013cement ratio; grades and strength; concrete mix design; testing of concrete; mixing, transportation, pouring and curing; admixtures; high-strength concrete; prestressed concrete technology.<\/li>\n<\/ul>\n<h3>4. Construction Management (12)<\/h3>\n<ul>\n<li>Scheduling and planning: CPM, PERT, bar charts. Contracts: types of contract, tender and tender notice, bid documents, contractor pre-qualification, tender evaluation and contractor selection, contract acceptance, conditions of contract, quotation and direct order, contractor classification, dispute resolution, muster roll. Material management and handling; cost control and quality control; project maintenance; occupational health and safety; monitoring and evaluation; quality assurance plans; variations, alterations and omissions.<\/li>\n<\/ul>\n<h3>5. Estimating &amp; Costing, Valuation &amp; Specification (10)<\/h3>\n<ul>\n<li>Types of estimates and their uses; methods of calculating quantities; estimating norms and rate analysis; preparation of bills of quantities; specifications \u2014 purpose, types, importance; valuation \u2014 purpose, principles, methods.<\/li>\n<\/ul>\n<h3>6. Drawing Techniques (10)<\/h3>\n<ul>\n<li>Drawing sheet composition; scales; site plans, preliminary and working drawings; projection theory \u2014 perspective, orthographic, axonometric; first and third angle projection; drafting tools and equipment; drafting conventions and symbols; topographic, electrical, plumbing and structural drawings; freehand drawing.<\/li>\n<\/ul>\n<h3>7. Engineering Survey (8)<\/h3>\n<ul>\n<li>Introduction and basic principles; linear measurements \u2014 chain, tape, ranging rods, arrows; scales; sources of error; slope correction; chain\/tape corrections; Abney level and clinometers; compass and plane-table surveying; levelling and contouring \u2014 temporary\/permanent adjustment, bench marks, booking methods, longitudinal and cross sectioning, reciprocal and trigonometric levelling, contour characteristics; theodolite traversing \u2014 coordinates, closed-traverse adjustment, closing errors; total station and EDM.<\/li>\n<\/ul>\n<h3>8. Engineering Economics (8)<\/h3>\n<ul>\n<li>Benefit\u2013cost analysis; cost classification; sensitivity analysis; internal rate of return; time value of money; economic equilibrium; demand, supply and production; net present value; financial and economic evaluation.<\/li>\n<\/ul>\n<h3>9. Professional Practices (5)<\/h3>\n<ul>\n<li>Ethics and professionalism; code of conduct for engineering practice; Nepal Engineering Council Act, 2055 and Regulations, 2056; relations with clients, contractors and fellow professionals; public procurement practices for works, goods and services.<\/li>\n<\/ul>\n<h2>Practice quiz<\/h2>\n<p>100 original practice MCQs in 5 sets of 20, mirroring the Paper I unit weights \u2014 with instant feedback. <a href=\"https:\/\/eve-construction.com\/wp-content\/uploads\/2026\/09\/lok-sewa-engineer-quiz.html\">Start the Engineer practice quiz \u2192<\/a><\/p>\n<h2>How to use this with our practice quizzes<\/h2>\n<ul>\n<li>Quiz Sets 1\u20135 (100 questions) mirror the Paper I unit weights above \u2014 roughly 4 structure, 3 materials and 2 each from the rest per set, mixing recall, application and numerical questions.<\/li>\n<li>Aim for 80+\/100 in practice before the real paper: the \u22120.2 negative marking punishes blind guessing, so practice eliminating options.<\/li>\n<li>Paper II is subjective \u2014 use the same syllabus one level deeper: be ready to derive, design and explain, not just tick options.<\/li>\n<\/ul>\n<p><em>Syllabus summary compiled from the official PSC syllabus text (effective 2066\/01\/17 BS). Always cross-check the current advertisement on psc.gov.np \u2014 PSC occasionally revises syllabi.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Post: Engineer (\u0907\u0928\u094d\u091c\u093f\u0928\u093f\u092f\u0930), Nepal Engineering Service, Civil Group \u2014 General, Highway, Sanitary, Irrigation and Hydropower sub-groups. Level: \u0930\u093e\u091c\u092a\u0924\u094d\u0930\u093e\u0902\u0915\u093f\u0924 \u0924\u0943\u0924\u0940\u092f \u0936\u094d\u0930\u0947\u0923\u0940 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":329,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-331","page","type-page","status-publish","hentry"],"_hostinger_reach_plugin_has_subscription_block":false,"_hostinger_reach_plugin_is_elementor":false,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/comments?post=331"}],"version-history":[{"count":1,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/331\/revisions"}],"predecessor-version":[{"id":332,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/331\/revisions\/332"}],"up":[{"embeddable":true,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/329"}],"wp:attachment":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/media?parent=331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}