{"id":285,"date":"2026-09-30T00:23:42","date_gmt":"2026-09-30T00:23:42","guid":{"rendered":"https:\/\/eve-construction.com\/?page_id=285"},"modified":"2026-09-30T00:23:43","modified_gmt":"2026-09-30T00:23:43","slug":"nec-exam-syllabus-civil-engineering","status":"publish","type":"page","link":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/nec-prep\/nec-exam-syllabus-civil-engineering\/","title":{"rendered":"NEC Exam Syllabus \u2014 Civil Engineering"},"content":{"rendered":"<h1>NEC License Exam \u2014 Civil Engineering Syllabus Overview<\/h1>\n<blockquote><p><strong>About this page:<\/strong> Syllabus content below is transcribed from publicly available copies of the official NEC syllabus and cross-checked across multiple sources. Anything not verifiable is marked <strong>(verify)<\/strong>.<\/p><\/blockquote>\n<h2>Exam pattern (verified across multiple sources)<\/h2>\n<table><thead><tr><th>Item<\/th><th>Detail<\/th><\/tr><\/thead><tbody>\n<tr><td>Exam<\/td><td>Nepal Engineering Council (NEC) Registration \/ License Examination \u2014 Civil<\/td><\/tr>\n<tr><td>Format<\/td><td>100 objective MCQs, 1 mark each<\/td><\/tr>\n<tr><td>Duration<\/td><td>2 hours (120 minutes \u2192 ~72 seconds per question)<\/td><\/tr>\n<tr><td>Full marks<\/td><td>100<\/td><\/tr>\n<tr><td>Pass marks<\/td><td>50 (50%) \u2014 the exam is qualifying, not rank-based<\/td><\/tr>\n<tr><td>Negative marking<\/td><td>None \u2014 attempt every question<\/td><\/tr>\n<tr><td>Syllabus structure<\/td><td>10 chapters, 6 sub-topics per chapter<\/td><\/tr>\n<\/tbody><\/table>\n<p>Sources: <a href=\"https:\/\/necprep.com\/blog\/complete-guide-to-clearing-the-nepal-engineering-council-nec-license-exam-syllabus-mcqs-ai-strategy\" target=\"_blank\" rel=\"noopener\">necprep.com exam-pattern guide<\/a> (100 MCQs, 2 hrs, FM 100, PM 50, no negative marking); model question sets on <a href=\"https:\/\/www.scribd.com\/document\/698172811\/NEC-MODEL-SET-1-PDF-230905-193908\" target=\"_blank\" rel=\"noopener\">Scribd \u2014 Model Set 1<\/a> and <a href=\"https:\/\/www.scribd.com\/document\/698172809\/NEC-MODEL-SET-2-PDF-230905-193958\" target=\"_blank\" rel=\"noopener\">Model Set 2<\/a> (both header: &#8220;FM: 100, Time: 2 hours, PM: 50&#8221;).<\/p>\n<p><strong>(verify):<\/strong> Some model sets are labelled &#8220;Group A (60\u00d71 = 60 marks)&#8221;, which suggests the paper may be split into groups (e.g. Group A \/ Group B) \u2014 the composition of the groups could not be verified from an official source. Prep portals describe the exam as computer-based, but this was not confirmed from NEC itself. Always check the latest notice on the official NEC website before your exam date.<\/p>\n<h2>The 10 chapters<\/h2>\n<p>Chapters 1\u20134 cover fundamentals and principles; chapters 5\u20139 cover application of engineering principles in practice; chapter 10 covers project planning, design and implementation. Source: <a href=\"https:\/\/edusanjal.com\/exam\/civil-engineering-exam\/\" target=\"_blank\" rel=\"noopener\">edusanjal.com \u2014 Civil Engineering: NEC Registration Examination<\/a> (corroborated by copies on Scribd and studynovo.com).<\/p>\n<h3>1. Basic Civil Engineering (ACiE01)<\/h3>\n<ul>\n<li>1.1 Engineering materials \u2014 properties (physical, chemical, mechanical, thermal); types, characteristics, composition, selection and use of stones, bricks, tiles, cement, lime, timber, metals\/alloys, paints\/varnishes, asphalt\/bitumen\/tar<\/li>\n<li>1.2 Standards (NS &amp; IS) and tests \u2014 brick (water absorption, compressive), cement (consistency, setting time, soundness, compressive strength), aggregate (bulking of sand), rebar (tensile test)<\/li>\n<li>1.3 Building technology \u2014 brick\/stone masonry, carpentry, painting, plastering, concrete roofing, flooring, DPC; building by-laws<\/li>\n<li>1.4 Geometric properties of sections \u2014 axes of symmetry, centre of gravity, moment of inertia, radius of gyration<\/li>\n<li>1.5 Surveying and levelling \u2014 fundamentals, linear\/angular measurement, levelling, topographic survey, simple circular curves, GPS\/GIS principles<\/li>\n<li>1.6 Estimating, costing and valuation \u2014 types of estimate, methods of estimating, rate analysis, specifications, valuation<\/li>\n<\/ul>\n<h3>2. Soil Mechanics and Foundation Engineering (ACiE02)<\/h3>\n<ul>\n<li>2.1 Soil properties and lab tests \u2014 strength, permeability, compressibility, phase relationships; index properties; soil classification (descriptive, textural, ISI, MIT, USCS); boring logs; sieve analysis; Atterberg limits<\/li>\n<li>2.2 Stresses and seepage \u2014 effective stress, capillary rise, quicksand; seepage pressure, flow nets; compressibility indices; compaction<\/li>\n<li>2.3 Shear strength and slope stability \u2014 Mohr\u2013Coulomb theory, principal stresses, shear tests, stability of slopes<\/li>\n<li>2.4 Soil exploration, earth pressure, retaining structures \u2014 exploration methods, sampling, field tests; earth pressure theories; retaining wall stability<\/li>\n<li>2.5 Fundamentals of foundation \u2014 types (shallow\/deep), functions, spread and mat foundations<\/li>\n<li>2.6 Bearing capacity and settlement \u2014 Terzaghi&#8217;s theory, modes of failure, consolidation, settlement types and calculations<\/li>\n<\/ul>\n<h3>3. Basic Water Resources Engineering (ACiE03)<\/h3>\n<ul>\n<li>3.1 Fluids and their properties \u2014 density, specific weight\/gravity, viscosity, capillarity, surface tension, cavitation, vapour pressure<\/li>\n<li>3.2 Hydrostatics \u2014 Pascal&#8217;s law, manometers, pressure force and centre of pressure, buoyancy, floating-body stability<\/li>\n<li>3.3 Hydro-kinematics and hydro-dynamics \u2014 flow classification, continuity, momentum, Bernoulli&#8217;s equation, flow measurement<\/li>\n<li>3.4 Pipe flow \u2014 major\/minor losses, HGL\/TEL, pipe networks, water hammer<\/li>\n<li>3.5 Open channel flow \u2014 specific energy\/force, GVF profiles, hydraulic jump, mobile-boundary channels, Shields diagram<\/li>\n<li>3.6 Hydrology \u2014 hydrologic cycle, hydrographs, unit hydrographs, rainfall\u2013runoff, flood frequency, groundwater<\/li>\n<\/ul>\n<h3>4. Structural Mechanics (ACiE04)<\/h3>\n<ul>\n<li>4.1 Shear force and bending moment \u2014 AF\/SF\/BM diagrams and interpretation<\/li>\n<li>4.2 Stress and strain analysis \u2014 principal stresses\/planes, stress\u2013strain curves, torsion<\/li>\n<li>4.3 Theory of flexure and columns \u2014 bending theory, deflection, bending stress, Euler&#8217;s column formula<\/li>\n<li>4.4 Determinate structures I \u2014 determinacy, energy\/virtual work methods, beam and portal-frame deflection<\/li>\n<li>4.5 Determinate structures II \u2014 influence lines, two-hinged arches<\/li>\n<li>4.6 Indeterminate structures \u2014 flexibility method, slope deflection, moment distribution, stiffness method, influence lines for continuous beams, elementary plastic analysis<\/li>\n<\/ul>\n<h3>5. Design of Structures (ACiE05)<\/h3>\n<ul>\n<li>5.1 Loads and load combinations \u2014 dead, imposed, wind, snow, earthquake loads<\/li>\n<li>5.2 Concrete technology \u2014 materials, properties, mix design, testing, QC, IS\/NS codes<\/li>\n<li>5.3 RCC structures I \u2014 working stress and limit state methods; beams and slabs (bending, shear, deflection, bond, anchorage)<\/li>\n<li>5.4 RCC structures II \u2014 columns, isolated\/combined footings, prestressed concrete<\/li>\n<li>5.5 Steel structures \u2014 sections, bolted\/welded connections, ties, struts, columns, column bases<\/li>\n<li>5.6 Timber and masonry \u2014 timber beam\/column principles; masonry design, NBC mandatory rules of thumb, failure modes, mortars<\/li>\n<\/ul>\n<h3>6. Water Supply, Sanitation and Environment (ACiE06)<\/h3>\n<ul>\n<li>6.1 Water sources, quality and demand \u2014 impurities, hardness, alkalinity, water-borne diseases, drinking-water standards, demand estimation<\/li>\n<li>6.2 Intake and distribution \u2014 intake types, pipe materials\/joints\/valves, break pressure tanks, service reservoirs, branch\/looped networks<\/li>\n<li>6.3 Water treatment \u2014 screening, sedimentation, coagulation\/flocculation, filtration, disinfection, softening, aeration, iron\/manganese removal<\/li>\n<li>6.4 Sewer design and construction \u2014 wastewater estimation, sewer types, design criteria, shapes, materials, appurtenances<\/li>\n<li>6.5 Wastewater treatment and disposal \u2014 BOD\/COD, grit chamber, activated sludge, oxidation ponds, oxygen sag (Streeter\u2013Phelps), septic tanks, sludge\/solid-waste disposal<\/li>\n<li>6.6 Environmental assessment \u2014 BES, IEE, EIA; government acts\/rules; disaster types and mitigation<\/li>\n<\/ul>\n<h3>7. Irrigation and Drainage (ACiE07)<\/h3>\n<ul>\n<li>7.1 Water demand estimation \u2014 crop\/irrigation requirements, duty\u2013delta relationship, efficiencies, effective rainfall<\/li>\n<li>7.2 Canal design \u2014 types, alignment; tractive force; Kennedy&#8217;s and Lacey&#8217;s theories; lined canals<\/li>\n<li>7.3 Diversion headworks \u2014 Bligh&#8217;s, Lane&#8217;s, Khosla&#8217;s seepage theories; silt excluder\/ejector; weir\/barrage design; energy dissipaters<\/li>\n<li>7.4 River training works \u2014 guide bunds, launching aprons, levees, spurs; watershed management<\/li>\n<li>7.5 Regulators and cross-drainage \u2014 regulators, escapes, pipe outlets, vertical drops, cross-drainage structures<\/li>\n<li>7.6 Waterlogging and drainage \u2014 causes, effects, prevention; surface\/subsurface drainage design<\/li>\n<\/ul>\n<h3>8. Hydropower (ACiE08)<\/h3>\n<ul>\n<li>8.1 Project planning \u2014 power potential of Nepal\/world; development stages; Nepal&#8217;s hydropower history, policy, acts<\/li>\n<li>8.2 Power and energy studies \u2014 installed-capacity fixing; plant types; components; reservoirs<\/li>\n<li>8.3 Storage-plant headworks \u2014 dam types\/selection\/design\/failure; gravity-dam stability; seepage control; spillways; gates<\/li>\n<li>8.4 Run-of-river headworks \u2014 intakes; sediment handling; settling-basin design (practice and concentration approaches); flushing<\/li>\n<li>8.5 Water conveyance \u2014 tunnels, forebay, surge tanks, penstocks, water hammer<\/li>\n<li>8.6 Machines and powerhouse \u2014 turbine types and selection, specific speed, Francis\/Pelton preliminary design, draft tubes, generators, governors, powerhouse layout<\/li>\n<\/ul>\n<h3>9. Transportation (ACiE09)<\/h3>\n<ul>\n<li>9.1 Highway planning and survey \u2014 transport modes, Nepal road-development history, road classification, alignment, Road Standards of Nepal<\/li>\n<li>9.2 Geometric design \u2014 cross-section elements, curves, super-elevation, gradients, stopping sight distance, hill-road considerations, road drainage<\/li>\n<li>9.3 Highway materials \u2014 aggregate tests, binding materials, asphalt mix design, subgrade evaluation<\/li>\n<li>9.4 Traffic engineering and safety \u2014 traffic studies (volume, speed, O&amp;D, capacity, accidents), intersections, signals, night visibility, safety measures<\/li>\n<li>9.5 Pavement \u2014 flexible vs rigid; design methods (DOR guidelines); load and temperature stresses<\/li>\n<li>9.6 Road construction and maintenance \u2014 equipment, subgrade preparation, compaction control, soil stabilization, asphalt layers, macadam, PCC pavements, maintenance\/rehabilitation<\/li>\n<\/ul>\n<h3>10. Project Planning, Design and Implementation (AALL10)<\/h3>\n<ul>\n<li>10.1 Engineering drawings \u2014 standard sheets, dimensions, scale, orthographic\/isometric\/sectional drawing<\/li>\n<li>10.2 Engineering economics \u2014 cash flow, time value of money, NPV, IRR, MARR, discounted payback; depreciation and taxation in Nepal<\/li>\n<li>10.3 Project planning and scheduling \u2014 life cycle, bar charts, CPM, PERT, resource levelling\/smoothing, monitoring and control<\/li>\n<li>10.4 Project management \u2014 MIS, risk analysis, project financing, tendering process, contract management<\/li>\n<li>10.5 Professional practice \u2014 ethics, regulatory environment, occupational health and safety, role of Nepal Engineers Association (NEA)<\/li>\n<li>10.6 Engineering regulatory body \u2014 Nepal Engineering Council Acts &amp; Regulations<\/li>\n<\/ul>\n<h2>Weightage guidance<\/h2>\n<p><strong>(verify):<\/strong> NEC does not publish official per-chapter mark distribution in the sources found. As a rough planning guide, 100 questions across 10 chapters averages ~10 questions per chapter, but model papers and prep experience suggest the calculation-heavy chapters (Soil Mechanics, Structural Mechanics, Design of Structures, Hydraulics) tend to carry slightly more weight than the descriptive ones. Treat this as a rule of thumb, not a fact \u2014 do not skip any chapter, since passing needs breadth across all 10.<\/p>\n<hr>\n<p><em>Prepared for eve-construction.com. Always verify against the latest official NEC notice before your exam date.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>NEC License Exam \u2014 Civil Engineering Syllabus Overview About this page: Syllabus content below is transcribed from publicly available copies [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":193,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-285","page","type-page","status-publish","hentry"],"_hostinger_reach_plugin_has_subscription_block":false,"_hostinger_reach_plugin_is_elementor":false,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/comments?post=285"}],"version-history":[{"count":1,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/285\/revisions"}],"predecessor-version":[{"id":286,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/285\/revisions\/286"}],"up":[{"embeddable":true,"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/pages\/193"}],"wp:attachment":[{"href":"https:\/\/eve-construction.com\/%e0%a4%a8%e0%a5%87%e0%a4%aa%e0%a4%be%e0%a4%b2%e0%a5%80\/wp-json\/wp\/v2\/media?parent=285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}